January 2012

More progess for the New Year! Happy 2012!!  Various views are shown below with the very latest pictures.

Exterior Shots

Pilothouse windows and door - starboard side view.


Working on the aft cockpit. Hawes holes and boarding gates are in (mostly).

Here is the latest on the flybridge facing the bow. The work is being done on the cabinet for the summer kitchen.

And, finally, the latest on the bow ......

 

Pilothouse

Working on the final coats of varnish on the Pilothouse helm and floor.

 

....the pilothouse settee and back wall....

 

....another view of the helm and map table.........

 

Saloon and Galley

 .... the saloon floor and the emergency hatch to the engine room.....

FYI- this hatch would only be used if something in the engine room has to come out for repair. There is a much easier access door to the engine room for routine maintenance and inspection.

 

 ...the port side saloon and the pilothouse steps.....

 

 ....the saloon settee and view through to the aft cockpit....

 

 ...... the galley upper cabinets....

 

 ....and prepping for the installation of the appliances..... and final varnishing.

 

 here we will have our viking range and refrigerator.....very soon...........

 

Staterooms and Heads

..... varnishing in the master head....

 

 ....and the guest head.....

 

Master Stateroom

 ....the starboard bureau and hanging lockers....

 

 ... the port hanging locker and a bit of the bed platform....

 

Guest Stateroom

 .... a partial view of the queen size berth platform at left and the desk to the right....

 ....and a bit more of the desk and office perspective.........

 

That's all folks............... for pictures.

But, we've been told we are moving ahead beautifully and can expect to be on a barge travelling stateside on January 18th. We have a Savannah, GA arrival expected on February 11th!

 

Happy New Year everyone!